Edge Trim and Dust Control Solutions

Overview

Impact has recently installed edge trim extraction systems and dust control systems at the UK sites of corrugated packaging producer Rigid Containers – situated at Desborough, Wellington and Selby. 

Les Swanick, Site Director at Rigid’s Desborough site commented on the installation:

“An efficient off cut removal system is essential in a fast turnaround production environment and to maintain our high manufacturing levels. The installation of the trim extraction systems caused minimal disruptions to our manufacturing site and we were pleased with the service we received. As one of the largest independent integrated corrugated manufacturers in the UK, reducing downtime is a necessary and vital part of our manufacturing strategy.”